Commit graph

121 commits

Author SHA1 Message Date
bfdd048269 Add Linear XLSX initial import 2026-09-30 09:50:58 +02:00
1cfeb06ec7 Replace Revit CSV backend with Linear XLSX 2026-09-30 08:46:07 +02:00
d4803a18d2 Document Linear Excel integration 2026-09-29 22:28:16 +02:00
3670f02ccd Document authenticated deployment 2026-09-28 22:42:11 +02:00
9165b8238c Compact single-board feeder circuit rows 2026-09-28 22:14:39 +02:00
b74b495fab Update print view and documentation for logical feeds 2026-09-28 20:57:58 +02:00
b50c00c0ac Bring documentation in line with integrated features
List the building structure, room areas, rough power balance and cable
sizing in the README and documentation map, add an architecture section
for the rough power balance, correct stale snapshot schema references and
record the integrated contributor features in the backlog.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-27 20:36:43 +02:00
dce31ee143 Add optional room areas 2026-09-27 20:00:03 +02:00
5cbbd3a84a Align cable sizing with DIN VDE 0298-4 2026-09-27 17:01:23 +02:00
598003554a Merge remote-tracking branch 'origin/main' into feature/cable-sizing 2026-09-27 16:54:12 +02:00
573487666c Integrate rough estimate balance 2026-09-27 12:37:59 +02:00
b9462e61c5 Defer Revit work and remove Dynamo scripts
Further Revit exchange will use the CSV export/import of the Linear
plugin instead of Dynamo, as preferred by the internal Revit/CAD
steering committee. Mark the Revit documentation as deferred and remove
the Dynamo diagnostic scripts, which stay reachable through the tag
archive/dynamo-vorueberlegungen.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-27 10:51:13 +02:00
868f48e7ac Integrate project building structure 2026-09-27 10:45:10 +02:00
4643c8d11a Integrate print view and document branding 2026-09-27 10:32:07 +02:00
3ffa50be4c Integrate consistent card styling
Document the shared card appearance. Validation: 431 tests, API/web builds, scripts and Next typechecks passed. GUI retest waived by the user.
2026-09-26 21:18:53 +02:00
2e223be8b4 Integrate project overview filters and icon actions
Document filter combinations, reset and browser persistence. Keep the search hint applicable before board information fields are introduced.

Validation: 20 focused tests, 431 total tests, API/web builds, scripts and Next typechecks, and diff checks passed. GUI retest skipped as authorized based on the colleague's prior testing.
2026-09-26 21:16:48 +02:00
0a17da2b8e Align runtime and editor documentation with current implementation 2026-09-26 21:02:48 +02:00
Grovy311
837b29c7c5 Add icon actions and collapsible filters to the project overview
The overview now uses the same icon buttons as the circuit list editor:
row actions are icon-only IconButtons (Pencil, Link2, Library, Trash2),
card-header and panel actions show icon plus text, and the circuit-list
link uses the new IconLink. The version history uses Undo2/Redo2, a
chevron toggle and a RotateCcw restore action. Page-header buttons stay
Bootstrap buttons with a lucide icon so the upcoming "Seitenansicht"
button of feature/print-view merges without conflicts and matches them.

The Verteilungen and Projektgeräte cards get a PM-style filter bar:
search plus MultiSelectDropdown (checkbox list with "Alle", closes on
outside click and Escape) and "Zurücksetzen" while a filter is active.
Only the bar collapses; the state is kept per card in localStorage and a
collapsed active filter shows "Filter aktiv". The header row shows
"x von y", and an empty-state row explains when filters hide everything.
The filter logic is a pure module (overview-filters.ts) with node tests;
selections that are no longer offered (deleted floor) are ignored.

IconButton now imports React explicitly like the other components that
are rendered in node tests with the classic JSX runtime.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-26 13:01:31 +02:00
Grovy311
cd89c4a499 Add buildings above floors and a building structure page
Projects with several buildings could not be structured: floors and rooms
hung directly off the project. Floors can now belong to a building
(migration 0009: table buildings, nullable floors.building_id). Rooms and
distribution boards keep their floor; their building follows from it.
Existing floors stay without a building.

Buildings use the location-structure command store with
project-building.insert/.update/.delete, inverses and persistent Undo/Redo;
deleting a building with assigned floors is rejected. Floor commands carry
buildingId since command version 2. Version 1 floor commands from existing
history predate buildings and are upgraded with buildingId = null before
they are executed and persisted, so forward and inverse keep one version.

Project snapshot schema 7 stores buildings and floor.buildingId; versions
1-6 are upgraded without buildings. Restore and portable transfer include
buildings, and the transfer remaps building ids.

Buildings, floors and rooms move from the project overview to their own
page /projects/:id/struktur with three columns (Gebäude -> Etagen -> Räume)
that filter each other, and a sidebar entry. Floor selects in the board and
room dialogs are grouped by building. Unchanged dialogs close without a
command. Details in docs/building-structure.md; see issue #6.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-26 12:52:34 +02:00
Grovy311
49488f4e1b Add optional cable-sizing module
Per-circuit cross-section recommendation as a separate module attached to
the circuit list. It never writes project data itself: "Übernehmen" applies
cable type, cross-section and length through the regular circuit.update
command, so revisions and Undo/Redo stay intact.

- Pure domain module (src/cable-sizing) with IEC 60364-5-52:2009 Annex B
  tables for PVC and XLPE, copper and aluminium, methods A1, A2, B1, B2, C,
  D1, D2 and E. Every value was cross-checked against public reproductions;
  where sources differ the lower value is used (docs/cable-sizing-module.md).
- Temperature and grouping between table values round to the safer value;
  values outside the tables return no result instead of a factor of 1.
  Ground methods use B.52.18 (D2) and B.52.19 A (D1).
- Overload protection: circuit-breakers In <= Iz; gG fuses additionally
  I2 <= 1.45 Iz with I2 = 1.6/1.9/2.1 In.
- Inputs prefilled from the circuit: power, phase (group or device rows),
  project voltage, power-weighted cos phi, length and protective device.
- Opened from a "Leitungsberechnung" button in the row actions, not from a
  grid cell, so cable cells keep the spreadsheet behavior.
- Stateless API under /api/cable-sizing; no database table or migration.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-26 11:16:18 +02:00
Grovy311
7692699ee2 Add print cover fields and office profile
- Project settings gain siteAddress, workStage, projectLead and
  projectEditor (project.update-settings schema version 3, migration 0009);
  versions 2 and 1 stay executable and keep the current cover values.
  Snapshot schema 6 carries the fields; older versions upgrade with null.
- Global office profile (office name/address) next to the document logo:
  table document_branding_settings, PUT /api/document-branding/office,
  editable from the print view toolbar.
- Cover page reads all fields; empty values show the "[ergänzen]" marker.
  The Planstände editor column shows the project editor.
- Shared logo constants moved to a dependency-free module so the Next.js
  bundler can import them.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-26 10:39:18 +02:00
Grovy311
4779e4a1a7 Add print view, board info card and document logo upload
- Seitenansicht (/projects/:projectId/print): tabular cover page, board
  overview with supply structure and power sums, one plan per board with a
  repeating title block; PDF via the browser print dialog with named @page
  rules (A4 portrait cover, A4/A3 landscape plans, page x of y).
- Distribution-board info card (board number, location, fed-from, remark)
  in the board edit dialog, persisted through the additively extended
  distribution-board.update command (migration 0008, snapshot schema 6,
  legacy subtree commands normalized).
- Global document logo upload (PNG/JPEG/SVG, max 2 MB) outside project
  revisions and snapshots.
- fed-from stays free text; the overview hierarchy and cumulated sums are
  preliminary until the feed link is modeled.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-26 10:38:59 +02:00
a99980c47b Update docs for the code-review fixes
- circuit-list-editor-api.md: next-identifier moved under
  /projects/:projectId and now documents its 404 scoping behavior.
- current-architecture.md: clarify that the BMK trigger register's
  DB-level normalization is ASCII-only and describe the added
  application-level Unicode-aware uniqueness check that closes the
  umlaut gap; note the additive migration 0006 indexes.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-08-06 21:33:28 +02:00
74bea1a3c9 Add Revit circuit list object feed 2026-08-02 18:59:01 +02:00
a69b7b603f Add external object new circuit command 2026-08-02 18:55:57 +02:00
347b3717c3 Add external object new row command 2026-08-02 18:44:46 +02:00
1a7dd7fe03 Add external object row assignment command 2026-08-02 18:38:38 +02:00
dac19b093c Add external row quantity foundation 2026-08-02 18:26:22 +02:00
bc2bc7ece5 Add Revit catalog creation flow 2026-08-02 18:08:18 +02:00
ab2449419b Add Revit initial import wizard 2026-08-02 17:52:21 +02:00
8646f346e6 Add Revit initial import apply API 2026-08-02 17:42:29 +02:00
c9e5fdd876 Add Revit initial import planning 2026-08-02 17:38:17 +02:00
c634570018 Add atomic Revit initial import 2026-08-02 17:33:32 +02:00
e87a3289fa Include external models in project snapshots 2026-08-02 17:25:25 +02:00
76493b573e Add external model persistence foundation 2026-08-02 17:18:24 +02:00
a9d6301753 Add Revit CSV project dialog 2026-08-02 16:59:18 +02:00
caa6caf99f Add Revit CSV preview API 2026-08-02 16:49:42 +02:00
219da5ec3b Persist Revit CSV configuration 2026-08-02 16:33:18 +02:00
44b6fde940 Add public building project setting 2026-07-31 17:41:30 +02:00
43a3bb0b69 Align documentation with clean baseline 2026-07-31 16:41:37 +02:00
1eed19ef6b Add editable project floors and rooms 2026-07-31 14:46:06 +02:00
734a2bcfc4 Create clean release database baseline 2026-07-31 14:07:26 +02:00
5bee3cb103 Add distribution board copy and delete controls 2026-07-31 12:03:52 +02:00
7c8d4a7ddf Document protected circuit groups 2026-07-31 08:06:10 +02:00
ab989cc637 Delete populated circuit groups safely 2026-07-31 08:01:55 +02:00
93ec294759 Move circuits between groups 2026-07-31 07:58:42 +02:00
be9c6f0d52 Renumber circuit groups explicitly 2026-07-31 07:53:07 +02:00
0cb280ddb2 Reorder circuit groups 2026-07-31 07:47:45 +02:00
8898117ed4 Configure circuit protection 2026-07-31 07:45:48 +02:00
18ca5eb3d4 Persist circuit protection updates 2026-07-31 07:37:38 +02:00