forked from jappel/leistungsbilanz-ts
Projects with several buildings could not be structured: floors and rooms hung directly off the project. Floors can now belong to a building (migration 0009: table buildings, nullable floors.building_id). Rooms and distribution boards keep their floor; their building follows from it. Existing floors stay without a building. Buildings use the location-structure command store with project-building.insert/.update/.delete, inverses and persistent Undo/Redo; deleting a building with assigned floors is rejected. Floor commands carry buildingId since command version 2. Version 1 floor commands from existing history predate buildings and are upgraded with buildingId = null before they are executed and persisted, so forward and inverse keep one version. Project snapshot schema 7 stores buildings and floor.buildingId; versions 1-6 are upgraded without buildings. Restore and portable transfer include buildings, and the transfer remaps building ids. Buildings, floors and rooms move from the project overview to their own page /projects/:id/struktur with three columns (Gebäude -> Etagen -> Räume) that filter each other, and a sidebar entry. Floor selects in the board and room dialogs are grouped by building. Unchanged dialogs close without a command. Details in docs/building-structure.md; see issue #6. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| calculations | ||
| errors | ||
| models | ||
| ports | ||
| services | ||