forked from jappel/leistungsbilanz-ts
List the building structure, room areas, rough power balance and cable sizing in the README and documentation map, add an architecture section for the rough power balance, correct stale snapshot schema references and record the integrated contributor features in the backlog. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| 01-domain-context.md | ||
| 02-functional-requirements.md | ||
| 03-data-model-concept.md | ||
| 04-ui-interaction-requirements.md | ||
| 05-linked-devices-and-sync.md | ||
| 06-future-sizing-and-calculations.md | ||
| 07-implementation-phases-todo.md | ||
| 08-current-product-backlog.md | ||
| 09-distribution-board-components-and-protection-groups.md | ||
| revit-csv-integration-requirements.md | ||
| revit-csv-phase-14-audit-and-plan.md | ||