@ -14,12 +14,18 @@ Future suggestions or checks may include:
|
|||
- cable type
|
||||
- number of cores
|
||||
- cable cross-section
|
||||
- halogen-free cable or line requirement for public buildings
|
||||
- minimum cable cross-section based on current
|
||||
- maximum permissible cable length based on voltage drop
|
||||
- warning messages if cable length, cross-section or protection device do not match
|
||||
|
||||
Users must remain able to manually override suggestions.
|
||||
|
||||
The project-owned `isPublicBuilding` setting is the authoritative input for
|
||||
the later halogen-free selection rule. The setting is persisted now; this
|
||||
document does not yet define or implement the complete cable catalog or sizing
|
||||
algorithm.
|
||||
|
||||
## Initial Design Rule Examples
|
||||
|
||||
These are common planning defaults, not a replacement for full norm-compliant calculation.
|
||||
|
|
|
|||