# Current Product Backlog
|
||||
|
||||
This document records the next agreed product improvements. It describes
|
||||
requirements and intended sequencing, not proof of implementation.
|
||||
|
||||
## Circuit List Editor
|
||||
|
||||
- Open the ProjectDevice drawer on the right so it does not cover the leading
|
||||
circuit identifier and display-name columns.
|
||||
- Format displayed power values in kW with at most three decimal places.
|
||||
- Format displayed factors and percentage-like values with at most two decimal
|
||||
places.
|
||||
- Do not round persisted values; formatting applies only to the displayed
|
||||
value outside edit mode.
|
||||
- Replace the separate `Zeilensumme` and `Stromkreissumme` columns with one
|
||||
`Gesamtsumme` column:
|
||||
- device rows show their device-row total;
|
||||
- circuit summary rows show the complete circuit total;
|
||||
- compact single-device rows show the identical device/circuit total once.
|
||||
- Collect the remaining editor interaction issues before changing additional
|
||||
behavior.
|
||||
|
||||
## Project History
|
||||
|
||||
- Every listed logical snapshot, including automatic snapshots, must be
|
||||
explicitly restorable from the project history UI.
|
||||
- Show which project change produced a snapshot. Prefer immutable revision
|
||||
metadata over storing a second free-form description of the same change.
|
||||
- Keep restoration auditable as a new project revision and preserve persistent
|
||||
undo/redo.
|
||||
|
||||
## Distribution Boards
|
||||
|
||||
- Assign an optional project floor to a distribution board.
|
||||
- Store a supply classification for each distribution board:
|
||||
- `AV` (Allgemeine Stromversorgung)
|
||||
- `SV` (Sicherheitsstromversorgung)
|
||||
- `EV` (Ersatzstromversorgung)
|
||||
- `USV` (Unterbrechungsfreie Stromversorgung)
|
||||
- Include both fields in project snapshots and portable project
|
||||
export/import.
|
||||
- Persist changes through project commands so they remain undoable after a
|
||||
restart.
|
||||
|
||||
## Device Voltage Defaults
|
||||
|
||||
- Derive voltage from the selected phase type and the project settings:
|
||||
- single-phase uses the project's single-phase voltage;
|
||||
- three-phase uses the project's three-phase voltage.
|
||||
- Apply this default consistently when creating global devices, project
|
||||
devices and manual circuit-list entries.
|
||||
- Define explicit override behavior before implementation so a user-entered
|
||||
exceptional voltage is not silently overwritten when phase type or project
|
||||
settings change.
|
||||
|
||||
## Project Overview Import
|
||||
|
||||
- Add JSON project import to the project overview so a portable project file
|
||||
can create a new project without first opening another project.
|
||||
- Keep replacement of an existing project inside that project's settings.
|
||||
- Validate format version and checksum before creating project data.
|
||||
|
||||
## Recommended Sequence
|
||||
|
||||
1. Circuit-list presentation improvements.
|
||||
2. Project-overview import as a new project.
|
||||
3. Distribution-board floor and supply fields.
|
||||
4. Device voltage default and override semantics.
|
||||
5. Snapshot-to-revision descriptions and history presentation.
|
||||
|
||||
The Revit/CSV/IFCGUID round-trip remains a separate jointly planned phase and
|
||||
must not be inferred from these tasks.
|
||||