Document current product backlog
This commit is contained in:
@@ -29,6 +29,7 @@ ausdrücklich getrennt und dürfen nicht als bereits implementiert verstanden we
|
|||||||
- [Projektversionen und externer Modellaustausch](project-history-and-external-model-architecture.md)
|
- [Projektversionen und externer Modellaustausch](project-history-and-external-model-architecture.md)
|
||||||
- [Zukünftige Dimensionierung](spec/06-future-sizing-and-calculations.md)
|
- [Zukünftige Dimensionierung](spec/06-future-sizing-and-calculations.md)
|
||||||
- [Roadmap und Phasen](spec/07-implementation-phases-todo.md)
|
- [Roadmap und Phasen](spec/07-implementation-phases-todo.md)
|
||||||
|
- [Aktueller Produkt-Backlog](spec/08-current-product-backlog.md)
|
||||||
|
|
||||||
## Fachliche Referenzspezifikation
|
## Fachliche Referenzspezifikation
|
||||||
|
|
||||||
|
|||||||
@@ -0,0 +1,72 @@
|
|||||||
|
# Current Product Backlog
|
||||||
|
|
||||||
|
This document records the next agreed product improvements. It describes
|
||||||
|
requirements and intended sequencing, not proof of implementation.
|
||||||
|
|
||||||
|
## Circuit List Editor
|
||||||
|
|
||||||
|
- Open the ProjectDevice drawer on the right so it does not cover the leading
|
||||||
|
circuit identifier and display-name columns.
|
||||||
|
- Format displayed power values in kW with at most three decimal places.
|
||||||
|
- Format displayed factors and percentage-like values with at most two decimal
|
||||||
|
places.
|
||||||
|
- Do not round persisted values; formatting applies only to the displayed
|
||||||
|
value outside edit mode.
|
||||||
|
- Replace the separate `Zeilensumme` and `Stromkreissumme` columns with one
|
||||||
|
`Gesamtsumme` column:
|
||||||
|
- device rows show their device-row total;
|
||||||
|
- circuit summary rows show the complete circuit total;
|
||||||
|
- compact single-device rows show the identical device/circuit total once.
|
||||||
|
- Collect the remaining editor interaction issues before changing additional
|
||||||
|
behavior.
|
||||||
|
|
||||||
|
## Project History
|
||||||
|
|
||||||
|
- Every listed logical snapshot, including automatic snapshots, must be
|
||||||
|
explicitly restorable from the project history UI.
|
||||||
|
- Show which project change produced a snapshot. Prefer immutable revision
|
||||||
|
metadata over storing a second free-form description of the same change.
|
||||||
|
- Keep restoration auditable as a new project revision and preserve persistent
|
||||||
|
undo/redo.
|
||||||
|
|
||||||
|
## Distribution Boards
|
||||||
|
|
||||||
|
- Assign an optional project floor to a distribution board.
|
||||||
|
- Store a supply classification for each distribution board:
|
||||||
|
- `AV` (Allgemeine Stromversorgung)
|
||||||
|
- `SV` (Sicherheitsstromversorgung)
|
||||||
|
- `EV` (Ersatzstromversorgung)
|
||||||
|
- `USV` (Unterbrechungsfreie Stromversorgung)
|
||||||
|
- Include both fields in project snapshots and portable project
|
||||||
|
export/import.
|
||||||
|
- Persist changes through project commands so they remain undoable after a
|
||||||
|
restart.
|
||||||
|
|
||||||
|
## Device Voltage Defaults
|
||||||
|
|
||||||
|
- Derive voltage from the selected phase type and the project settings:
|
||||||
|
- single-phase uses the project's single-phase voltage;
|
||||||
|
- three-phase uses the project's three-phase voltage.
|
||||||
|
- Apply this default consistently when creating global devices, project
|
||||||
|
devices and manual circuit-list entries.
|
||||||
|
- Define explicit override behavior before implementation so a user-entered
|
||||||
|
exceptional voltage is not silently overwritten when phase type or project
|
||||||
|
settings change.
|
||||||
|
|
||||||
|
## Project Overview Import
|
||||||
|
|
||||||
|
- Add JSON project import to the project overview so a portable project file
|
||||||
|
can create a new project without first opening another project.
|
||||||
|
- Keep replacement of an existing project inside that project's settings.
|
||||||
|
- Validate format version and checksum before creating project data.
|
||||||
|
|
||||||
|
## Recommended Sequence
|
||||||
|
|
||||||
|
1. Circuit-list presentation improvements.
|
||||||
|
2. Project-overview import as a new project.
|
||||||
|
3. Distribution-board floor and supply fields.
|
||||||
|
4. Device voltage default and override semantics.
|
||||||
|
5. Snapshot-to-revision descriptions and history presentation.
|
||||||
|
|
||||||
|
The Revit/CSV/IFCGUID round-trip remains a separate jointly planned phase and
|
||||||
|
must not be inferred from these tasks.
|
||||||
Reference in New Issue
Block a user