Plan documentation handoff after legacy cutover
This commit is contained in:
@@ -369,3 +369,62 @@ Acceptance criteria:
|
||||
- exported data can be assigned back to the correct Revit objects
|
||||
|
||||
PostgreSQL should be introduced when shared multi-user operation, background jobs or operational scale justify it. External-object count alone does not require an immediate migration.
|
||||
|
||||
## Phase 14: Documentation and Collaboration Handoff
|
||||
|
||||
Goal:
|
||||
|
||||
After the legacy consumer path has been removed, provide one accurate entry point for developers, contributors and LLM-assisted work.
|
||||
|
||||
Timing:
|
||||
|
||||
- perform the final rewrite after legacy cutover so the documentation describes only the supported architecture
|
||||
- update documentation incrementally during earlier phases, but do not present transitional paths as the long-term design
|
||||
|
||||
README target structure:
|
||||
|
||||
- short project purpose and current maturity/status
|
||||
- supported domain workflow at a high level
|
||||
- technology stack
|
||||
- prerequisites
|
||||
- recommended Docker development quick start
|
||||
- direct local development start
|
||||
- test, type-check and build commands
|
||||
- database persistence, migration, backup and restore basics
|
||||
- production deployment/install instructions once a production setup exists
|
||||
- concise documentation map
|
||||
- contribution entry point
|
||||
|
||||
README content to remove or relocate:
|
||||
|
||||
- historical requirement checklists
|
||||
- file-by-file implementation status from early prototypes
|
||||
- obsolete legacy consumer architecture
|
||||
- long domain specifications already maintained in `docs/`
|
||||
- broken links and claims that are not verified by the current code
|
||||
|
||||
Documentation tasks:
|
||||
|
||||
- add a `docs/README.md` index with current, future and archived documents clearly separated
|
||||
- keep current architecture, domain invariants, API behavior and interaction behavior synchronized with code
|
||||
- archive superseded initial requirements under `docs/archive/` when they are still useful for traceability
|
||||
- remove obsolete documentation that has no remaining historical or operational value
|
||||
- update `AGENTS.md` with current entry points, supported/deprecated paths and forward architecture constraints
|
||||
- add a concise contributor workflow for branches, migrations, tests and commits
|
||||
- document how a colleague creates an empty local database and optionally loads safe sample data
|
||||
- avoid duplicating the same architecture facts across README, `AGENTS.md` and detailed docs; link to one source of truth
|
||||
|
||||
Deployment documentation requirements:
|
||||
|
||||
- distinguish development Compose from production deployment
|
||||
- do not label the hot-reload development stack as a production setup
|
||||
- document required environment variables, ports, health checks, persistent storage and migration behavior
|
||||
- verify backup and restore procedures
|
||||
|
||||
Acceptance criteria:
|
||||
|
||||
- a colleague can clone the repository and start a clean development environment using only the README
|
||||
- a contributor can identify the supported architecture and relevant code entry points without reading historical specs
|
||||
- an LLM receives domain invariants, current module boundaries and deferred architecture direction without relying on stale legacy files
|
||||
- every README command and internal documentation link is verified
|
||||
- production instructions describe a real tested deployment path or clearly state that none is supported yet
|
||||
|
||||