# Current Product Backlog This document records the next agreed product improvements. It describes requirements and intended sequencing, not proof of implementation. ## Circuit List Editor - Open the ProjectDevice drawer on the right so it does not cover the leading circuit identifier and display-name columns. - Format displayed power values in kW with at most three decimal places. - Format displayed factors and percentage-like values with at most two decimal places. - Do not round persisted values; formatting applies only to the displayed value outside edit mode. - Replace the separate `Zeilensumme` and `Stromkreissumme` columns with one `Gesamtsumme` column: - device rows show their device-row total; - circuit summary rows show the complete circuit total; - compact single-device rows show the identical device/circuit total once. - Collect the remaining editor interaction issues before changing additional behavior. ## Project History - Every listed logical snapshot, including automatic snapshots, must be explicitly restorable from the project history UI. - Show which project change produced a snapshot. Prefer immutable revision metadata over storing a second free-form description of the same change. - Keep restoration auditable as a new project revision and preserve persistent undo/redo. ## Distribution Boards - Assign an optional project floor to a distribution board. - Store a supply classification for each distribution board: - `AV` (Allgemeine Stromversorgung) - `SV` (Sicherheitsstromversorgung) - `EV` (Ersatzstromversorgung) - `USV` (Unterbrechungsfreie Stromversorgung) - Include both fields in project snapshots and portable project export/import. - Persist changes through project commands so they remain undoable after a restart. ## Device Voltage Defaults - Derive voltage from the selected phase type and the project settings: - single-phase uses the project's single-phase voltage; - three-phase uses the project's three-phase voltage. - Apply this default consistently when creating global devices, project devices and manual circuit-list entries. - Define explicit override behavior before implementation so a user-entered exceptional voltage is not silently overwritten when phase type or project settings change. ## Project Overview Import - Add JSON project import to the project overview so a portable project file can create a new project without first opening another project. - Keep replacement of an existing project inside that project's settings. - Validate format version and checksum before creating project data. ## Recommended Sequence 1. Circuit-list presentation improvements. 2. Project-overview import as a new project. 3. Distribution-board floor and supply fields. 4. Device voltage default and override semantics. 5. Snapshot-to-revision descriptions and history presentation. The Revit/CSV/IFCGUID round-trip remains a separate jointly planned phase and must not be inferred from these tasks.