leistungsbilanz-ts/docs/spec
Julian Appel b50c00c0ac Bring documentation in line with integrated features
List the building structure, room areas, rough power balance and cable
sizing in the README and documentation map, add an architecture section
for the rough power balance, correct stale snapshot schema references and
record the integrated contributor features in the backlog.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-27 20:36:43 +02:00
..
01-domain-context.md specs for rewrite 2026-05-03 19:15:46 +02:00
02-functional-requirements.md specs for rewrite 2026-05-03 19:15:46 +02:00
03-data-model-concept.md Align documentation with clean baseline 2026-07-31 16:41:37 +02:00
04-ui-interaction-requirements.md Translate remaining frontend 2026-07-22 23:25:53 +02:00
05-linked-devices-and-sync.md specs for rewrite 2026-05-03 19:15:46 +02:00
06-future-sizing-and-calculations.md Add public building project setting 2026-07-31 17:41:30 +02:00
07-implementation-phases-todo.md Defer Revit work and remove Dynamo scripts 2026-09-27 10:51:13 +02:00
08-current-product-backlog.md Bring documentation in line with integrated features 2026-09-27 20:36:43 +02:00
09-distribution-board-components-and-protection-groups.md Add public building project setting 2026-07-31 17:41:30 +02:00
revit-csv-integration-requirements.md Defer Revit work and remove Dynamo scripts 2026-09-27 10:51:13 +02:00
revit-csv-phase-14-audit-and-plan.md Defer Revit work and remove Dynamo scripts 2026-09-27 10:51:13 +02:00