Commit graph

5 commits

Author SHA1 Message Date
d4803a18d2 Document Linear Excel integration 2026-09-29 22:28:16 +02:00
dce31ee143 Add optional room areas 2026-09-27 20:00:03 +02:00
57a62b7e4a Record the confirmed building structure decisions
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-27 11:17:24 +02:00
868f48e7ac Integrate project building structure 2026-09-27 10:45:10 +02:00
Grovy311
cd89c4a499 Add buildings above floors and a building structure page
Projects with several buildings could not be structured: floors and rooms
hung directly off the project. Floors can now belong to a building
(migration 0009: table buildings, nullable floors.building_id). Rooms and
distribution boards keep their floor; their building follows from it.
Existing floors stay without a building.

Buildings use the location-structure command store with
project-building.insert/.update/.delete, inverses and persistent Undo/Redo;
deleting a building with assigned floors is rejected. Floor commands carry
buildingId since command version 2. Version 1 floor commands from existing
history predate buildings and are upgraded with buildingId = null before
they are executed and persisted, so forward and inverse keep one version.

Project snapshot schema 7 stores buildings and floor.buildingId; versions
1-6 are upgraded without buildings. Restore and portable transfer include
buildings, and the transfer remaps building ids.

Buildings, floors and rooms move from the project overview to their own
page /projects/:id/struktur with three columns (Gebäude -> Etagen -> Räume)
that filter each other, and a sidebar entry. Floor selects in the board and
room dialogs are grouped by building. Unchanged dialogs close without a
command. Details in docs/building-structure.md; see issue #6.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-26 12:52:34 +02:00